Testset 4

Testset 4 is introduced in:

  • Kreter, S.: Lösungsverfahren für Ressourcennivellierungsprobleme. Masterarbeit, TU Clausthal, 2011.
  • Results are generated using a population-based resource leveling procedure introduced by Ballestin et al. (2007) (Ballestin, F., C. Schwindt and J. Zimmermann (2007). Resource Leveling in Make-to-Order Production: Modeling and Heuristic Solution Method. International Journal of Operations Research 4, 50-62) and modified by Kreter (2011) (Kreter, S.: Lösungsverfahren für Ressourcennivellierungsprobleme. Masterarbeit, TU Clausthal, 2011).
  • The time limit of the algorithm was for each instance the number of activities in seconds.

testset rlp_50_1

testset rlp_50_3

testset rlp_50_5

testset rlp_100_1

testset rlp_100_3

testset rlp_100_5

testset rlp_200_1

testset rlp_200_3

testset rlp_200_5

testset rlp_500_1

testset rlp_500_3

testset rlp_500_5

testset rlp_1000_1

testset rlp_1000_3

testset rlp_1000_5

 

Kontakt  Sitemap  Datenschutz  Impressum
© TU Clausthal 2018