- N. Trautmann, C. Schwindt
A cyclic approach to large-scale short-term planning in chemical batch production. Journal of Scheduling 12, 595-606, 2009
|  |
- F. Ballestin, C. Schwindt, J. Zimmermann
Resource leveling in make-to-order production: Modeling and heuristic solution method. International Journal of Operations Research 4, 50-62, 2007
|  |
- K. Neumann, C. Schwindt, N. Trautmann
Scheduling of continuous and discontinuous material flows with intermediate storage restrictions. European Journal of Operational Research 165, 495-509, 2005
|  |
- C. Mellentien, C. Schwindt, N. Trautmann
Scheduling the factory pick-up of new cars. OR Spectrum 26, 579-601, 2004
|  |
- R. Kolisch, K. Meyer, R. Mohr, C. Schwindt, M. Urmann
Ablaufplanung für die Leitstrukturoptimierung in der Pharmaforschung. Zeitschrift für Betriebswirtschaft 73, 825-848, 2003
|
 |
- K. Neumann, C. Schwindt, J. Zimmermann
Order-based neigborhoods for project scheduling with nonregular objective functions. European Journal of Operations Research 149, 325-343, 2003
|  |
- C. Schwindt, N. Trautmann
Scheduling the production of rolling ingots: Industrial context, model, and solution method. International Transactions in Operational Research 10, 547-563, 2003
|  |
- K. Neumann, C. Schwindt, N. Trautmann
Advanced production scheduling for batch plants in process industries. OR Spectrum 24, 251-279, 2002. Ist ebenfalls erschienen in: Günther, H.-O., van Beek, P. (eds.), Advanced Planning and Scheduling Solutions in Process Industries. Springer, Berlin, 2003, pp. 43-72
|  |
- C. Schwindt, J. Zimmermann
Parametrische Optimierung als Instrument zur Bewertung von Investitionsprojekten. Zeitschrift für Betriebswirtschaft 72, 593-617, 2002
|
 |
- K. Neumann, C. Schwindt
Project scheduling with inventory constraints. Mathematical Methods of Operations Research 56, 513-533, 2002
|  |
- K. Neumann, C. Schwindt, J. Zimmermann
Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications. Central European Journal of Operations Research 10, 113-148, 2002
|
 |
- C. Schwindt, J. Zimmermann
A steepest ascent approach to maximizing the net present value of projects. Mathematical Methods of Operations Research 53, 435-450, 2001
|  |
- B. Franck, K. Neumann, C. Schwindt
Project scheduling with calendars. OR Spektrum 23, 325-334, 2001
|  |
- B. Franck, K. Neumann, C. Schwindt
Truncated branch-and-bound, schedule construction, and schedule-improvement procedures for resource-constrained project scheduling. OR Spektrum 23, 297-324, 2001
|  |
- K. Neumann, H. Nübel, C. Schwindt
Active and stable project scheduling. Mathematical Methods of Operations Research 52, 441-465, 2000
|  |
- C. Schwindt, N. Trautmann
Batch scheduling in process industries: An application of resource-constrained project scheduling. OR Spektrum 22, 501-524, 2000
|  |
- K. Neumann, C. Schwindt
A capacitated hierarchical approach to make-to-order production. European Journal of Automation 32, 397-413, 1998
|
 |
- B. Franck, K. Neumann, C. Schwindt
A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods. OR Spektrum 19, 77-85, 1997
|  |
- K. Neumann, C. Schwindt
Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production. OR Spektrum 19, 205-218, 1997
|  |
- N. Krippendorff, C. Schwindt
Allocation and management of shared production buffers: Problem formulation and classification scheme. Extended Abstracts of the 12th Conference on Stochastic Models of Manufacturing and Service Operations SMMSO 2019, pp. 85-87
|
- C. Schwindt
Termin- und Kapazitätsplanung. In: H. Corsten, R. Gössinger, T. S. Spengler (eds.), Handbuch Produktions- und Logistikmanagement in Wertschöpfungsnetzwerken. de Gruyter, Berlin und Boston, 2018, pp. 624-645
|  |
- A. Heßler, C. Schwindt
Markov models for system throughput analysis in warehouse design. In: A. Fink, A. Fügenschuh, M. J. Geiger (eds.), Operations Research Proceedings 2016. Springer, Berlin, 2017, pp. 475-480
|  |
- A. Heßler, C. Schwindt
Throughput analysis of random storage systems operated under the closest eligible location rule. In: A. De Meyer, K. H. Chai, R. Jiao, N. Chen, M. Xie (eds.) Proceedings of the 2017 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 10-13, 2017, Paper IEEM17-P-0411 (nominated for Best Paper Award)
|  |
- A. Heßler, C. Schwindt
Throughput analysis of random storage systems: Closest eligible location pays. In: T. Bousonville, T. Melo, N. Rezg, F. Vernadat (eds.) Proceedings of the 7th International Conference on Industrial Engineering and Systems Management IESM 2017, Saarbrücken, October 11-13, 2017, pp. 44-49.
|
 |
- C. Schwindt, T. Paetz
A serial schedule-generation scheme for preemptive project scheduling problems with generalized precedence relations and regular min-max criteria. In: Proceedings of the 15th International Conference on Project Management and Scheduling, Valencia, April 19-22, 2016, pp. 210-214
|
 |
- I. Weiss, C. Schwindt
The Resource Transfer Problem. In: Proceedings of the 15th International Conference on Project Management and Scheduling, Valencia, April 19-22, 2016, pp. 42-46
|
 |
- I. Weiss, C. Schwindt
The Resource Transfer Problem: Modeling and solving integrated scheduling and routing problems.
Proceedings of the 2016 IEEE International Conference on Industrial Engineering and Engineering Management, Bali, 2016, December 5-7, 2016, Paper IEEM16-P-0272
|  |
- C. Schwindt, T. Paetz
Continuous Preemption Problems. In: C. Schwindt, J. Zimmermann (eds.), Handbook on Project Management and Scheduling. International Handbooks on Information Systems, Springer, Berlin, 2015, Chapter 13, pp. 251-295
|  |
- C. Schwindt, J. Zimmermann
Project management and scheduling. In: C. Schwindt, J. Zimmermann (eds.), Handbook on Project Management and Scheduling. International Handbooks on Information Systems, Springer, Berlin, 2015, pp. xxi-xlvii
|  |
- T. Paetz, C. Schwindt
Column generation-based lower bounds
for resource leveling problems. In: T. Fliedner, R. Kolisch, A. Naber (eds.), Proceedings of the 14th International Conference on Project Management and Scheduling, Munich, March 30-April 2, 2014, pp. 173-176
|  |
- C. Schwindt, T. Haselmann
The preemptive project scheduling problem with
generalized precedence relationships. Proceedings of the 13th International Conference on Project Management and Scheduling, Leuven, April 1-4, 2012, pp. 278-281
|  |
- B. Scholz-Reiter, C. Schwindt, E. M. Frazzon, Th. Makuschewitz
An approach to negotiation-based alignment of manufacturing and transportation systems along global production networks. In: N. A. Duffie (ed.), Proceedings of the 44th CIRP Conference on Manufacturing Systems, Madison, WI, May 31–June 3, 2011. Omnipress, Madison, WI
|
- B. Scholz-Reiter, C. Schwindt, Th. Makuschewitz, E. M. Frazzon
An approach for the integration of production scheduling and inter-facility transportation within global supply chains. In: M. D. Hanna (ed.), Proceedings of the POMS 21st Annual Conference, Vancouver, May 7-10, 2010, Paper 015-0387
|  |
- C. Schwindt, S. Herrmann, H. Sagebiel
A closed-loop approach to continuous process scheduling. In: Sun, H., Jiao, R., Xie, M. (eds.), Proceedings of the 2009 IEEE International Conference on Industrial Engineering and Engineering Management, Hong Kong, December 8-11, 2009, pp. 1951-1955 (honored with Conference Paper Award)
|  |
- N. Trautmann, R. Fink, H. Sagebiel, C. Schwindt
A decomposition approach to short-term scheduling of multi-purpose batch processes. 18th European Symposium on Computer Aided Process Engineering. Elsevier, Amsterdam, 2008, pp. 157-162
|  |
- S. Herrmann, C. Schwindt
A heuristic for the short-term planning of multi-purpose continuous plants. 18th European Symposium on Computer Aided Process Engineering. Elsevier, Amsterdam, 2008, Paper FP00309
|  |
- N. Trautmann, R. Fink, H. Sagebiel, C. Schwindt
A MIP/RCPSP decomposition approach to short-term planning in chemical batch production with non-identical parallel processing units. In: Helander, M., Xie, M., Jiao, R., Tan, K.C. (eds.), Proceedings of the 2007 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 2-5, 2007, pp. 1342-1346
(nominated for Best Paper Award)
|  |
- C. Schwindt, R. Fink, N. Trautmann
A priority-rule based method for scheduling in chemical batch production. In: Helander, M., Xie, M., Jiao, R., Tan K.C. (eds.), Proceedings of the 2007 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 2-5, 2007, pp. 1347-51
|  |
- N. Trautmann, C. Schwindt
Large-scale short-term planning in chemical batch production. In: Baptiste, Ph., Kendall, G., Munier-Kordon, A., Sourd, F. (eds.), Proceedings of the 3rd Multidisciplinary International Conference on Scheduling: Theory and Applications, Paris, August 28-31, 2007, pp. 490-497
|  |
- S. Herrmann, C. Schwindt
Planning and scheduling continuous operations in the process industries. In: Günther, H.-O., Mattfeld, D.C., Suhl, L., (eds.), Management logistischer Netzwerke. Physica, Heidelberg, 2007, pp. 279-299
|  |
- C. Schwindt, N. Trautmann
Rolling ingots production scheduling. Artigues, C., Demassey, S., Néron, E. (eds.), Resource-Constrained Project Scheduling: Models, Extensions, and Applications. ISTE Publishing, London, 2007, Ch. 17, pp. 263-273
|  |
- C. Schwindt, N. Trautmann
A cyclic approach to large-scale short-term planning of multi-purpose batch plants. In: Morlock, M., Schwindt, C., Trautmann, N., Zimmermann, J. (eds.), Perspectives on Operations Research: Essays in Honor of Klaus Neumann. Deutscher Universitäts-Verlag, Wiesbaden, 2006, pp. 225-238
|  |
- C. Schwindt, S. Herrmann, N. Trautmann
A heuristic decomposition method for the short-term planning of continuous plants. Proceedings of the Tenth International Workshop on Project Management and Scheduling, Posnan, April 26-28, 2006, pp. 313-318
|
 |
- Trautmann, N., Schwindt, C.
A heuristic method for large-scale batch scheduling in the process industries. In: Haasis, H.-D., Kopfer, H., Schönberger, J. (eds.), Operations Research Proceedings 2005. Springer, Berlin, 2006, pp. 155-160
|  |
- C. Schwindt, S. Herrmann, N. Trautmann
Planning and scheduling of multipurpose continuous plants. In: Marquardt, W., Pantelides, C. (eds.), 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering. Elsevier, Amsterdam, 2006, pp. 2159-2164
|  |
- N. Trautmann, C. Schwindt
Priority-rule based scheduling of chemical batch processes. In: Marquardt, W., Pantelides, C. (eds.), 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering. Elsevier, Amsterdam, 2006, pp. 2165-2170
|  |
- K. Neumann, C. Schwindt, J. Zimmermann
Resource-constrained project scheduling with time windows: Recent developments and new applications. In: Jozefowska, J., Weglarz, J. (eds.), Perspectives in Modern Project Scheduling. Kluwer, Boston, 2006, pp. 375-407
|  |
- N. Trautmann, C. Schwindt
A MINLP/RCPSP decomposition approach for the short-term planning of batch production. In: Piugjaner, L., Espuna, A. (eds.), 15th European Symposium on Computer Aided Process Engineering. Elsevier, Amsterdam, 2005, pp. 1309-1314
|  |
- C. Schwindt, N. Trautmann
A priority-rule based method for batch production scheduling in the process industries. In: Ahr, D., Fahrion, R., Oswarld, M., Reinelt, G. (eds.), Operations Research Proceedings 2003. Springer, Berlin, 2004, pp. 111-118
|  |
- K. Gentner, K. Neumann, C. Schwindt, N. Trautmann
Batch production scheduling in the process industries. In: Leung, J.Y.T. (ed.), Handbook of Scheduling: Algorithms, Models and Performance Analysis. CRC Press, Boca Raton, 2004, pp. 48.1-48.21
|
- C. Schwindt
Project scheduling with changeover times: A branch-and-bound approach. Proceedings of the International Conference on Industrial Engineering and Production Management, Porto, May 26-28, 2003, pp. 44-52
|
 |
- C. Schwindt, N. Trautmann
Scheduling of rolling ingots production. In: Leopold-Wildburger, U., Rendl, F., Wäscher, G. (eds.), Operations Research Proceedings 2002. Springer, Berlin, 2003, pp. 83-88
|  |
- J. Zimmermann, C. Schwindt
Parametric optimization for the evaluation of investment projects. In: Proceedings of the Eight International Workshop on Project Management and Scheduling, Valencia, April 3-5, 2002, pp. 378-382
|  |
- C. Schwindt, N. Trautmann
Scheduling continuous material flows. In: Proceedings of the 18th International Conference on CAD/CAM, Robotics, and Factories of the Future, Porto, July 3-5, 2002, pp. 757-764
|
 |
- C. Schwindt
Scheduling of continuous production in process industries. In: Proceedings of the Eigth International Workshop on Project Management and Scheduling, Valencia, April 3-5, 2002, pp. 314-317
|
 |
- C. Schwindt, N. Trautmann
Storage problems in batch scheduling. In: Chamoni, P., Leisten, R., Martin, A., Minnemann, J., Stadtler, H. (eds.), Operations Research Proceedings 2001. Springer, Berlin, 2002, pp. 213-217
|  |
- N. Trautmann, C. Schwindt
Storage problems in process scheduling. In: Proceedings of the 18th International Conference on CAD/CAM, Robotics and Factories of the Future, Porto, July 3-5, 2002, pp. 749-754
|
 |
- K. Neumann, C. Schwindt, N. Trautmann
Short-term planning of batch plants in process industries. In: Kischka, P., Leopold-Wildburger, U., Möhring, R.H., Radermacher, F.J. (eds.), Models, Methods and Decision Support for Management. Physica, Heidelberg, 2001, pp. 211-226
|  |
- C. Schwindt
Solution procedures for production planning and detailed scheduling in process industries. In: Proceedings of the International conference on Industrial Engineering and Production Management, Québec City, August 20-23, 2001, pp. 271-280
|
 |
- C. Schwindt
Local search for the project scheduling with convex objective functions. In: Proceedings of the Seventh International Workshop on Project Management and Scheduling, Osnabrück, April 17-19, 2000, pp. 239-241
|
 |
- C. Schwindt
Minimizing earliness-tardiness costs of resource-constrained projects. In: Inderfurth, K., Schwödiauer, G., Domschke, W., Juhnke, F., Kleinschmiddt, P., Wäscher, G. (eds.), Operations Research Proceedings 1999. Springer, Berlin, 2000, pp. 402-407
|  |
- C. Schwindt
A branch-and-bound algorithm for the project duration problem subject to temporal and cumulative resource constraints. In: Proceedings of the International conference on Industrial Engineering and Production Management, Glasgow, July 12-15, 1999, pp. 515-522
|
 |
- R. Kolisch, C. Schwindt, A. Sprecher
Benchmark instances for project scheduling problems. In: Weglarz, J. (ed.), Project Scheduling: Recent Models, Algorithms and Applications. Kluwer, Boston, 1999, pp. 197-212
|  |
- C. Schwindt
Integrated multi-level capacitated lot sizing and temporal plus capacity planning. In: Proceedings of the International Conference on Industrial Engineering and Production Management, Lyon, October 20-24, 1997, pp. 102-109
|
- C. Schwindt
A new branch-and-bound-based heuristic for resource-constrained project scheduling with minimal and maximal time lags. In: Proceedings of the Fifth International Workshop on Project Management and Scheduling, Posnan, April 11-13, 1996, pp. 212-215
|
 |
- C. Schwindt
An efficient heuristic for solving resource-constrained project scheduling problems arising from make-to-order production. In: Proceedings of the Workshop on Production Planning and Control, Mons, September 9-11, 1996, pp. 4-7
|