| M. Reinke, J. Zimmermann (2021)A Comparative Performance Analysis of Two MILP Formulations for the Resource-Renting-Problem
 In: 2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2021, pp. 979-983, doi: 10.1109/IEEM50564.2021.9672971
 | 
| F. Merz, C. Schwindt, S. Westphal, J. Zimmermann (2021)An Auction-based Mechanism for the Formation and Scheduling of Heterogeneous Human-machine Teams
 In: 2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2021, pp. 863-868, doi: 10.1109/IEEM50564.2021.9672780
 | 
|  | 
|  | 
| F. Merz, C. Schwindt, S. Westphal and J. Zimmermann (2020)A Multi-Round Auction for Staff to Job Assignment Under Myopic Best Response Dynamics
 In: 2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), Singapore, 2020, pp. 1137-1141, doi: 10.1109/IEEM45057.2020.9309851.
 | 
| Seifi, C., Schulze, M., Zimmermann, J (2019)A two-stage solution approach for a shift scheduling problem with a simultaneous assignment of machines and workers
 In: Mining goes Digital: Proceedings of the 39th International Symposium Application of Computers and Operations Research in the Mineral Industry (APCOM 2019), Wroclaw, Poland, CRC Press. pp. 377-385.
 | 
|  | 
| K. Watermeyer, J. Zimmermann (2018)A Branch-and-Bound Procedure for the Resource-Constrained Project Scheduling Problem with Partially Renewable Resources and Time Windows
 In: Proceedings of the 16th International Conference on Project Management and Scheduling, Rome, Italy, 259-262
 | 
| J. Zimmermann (2018)Mathematische Methoden zur Lösung von Logistikproblemen
 In: Taschenbuch der Logistik, Fachbuchverlag Leipzig, Chapter19, 273-288, 5th edition
 | 
|  | 
|  | 
| K. Watermeyer, M.A. Aßbrock, S. Kreter, J. Zimmermann (2016)Exact Solution Procedures for RCPSP/π
 In: Proceedings of the 15th International Conference on Project Management and Scheduling, Valencia, Spain, 13-16
 | 
| S. Kreter, J. Zimmermann (2016)The Resource Availability Cost Problem with General Temporal Constraints and Calendars
 In: Proceedings of the 15th International Conference on Project Management and Scheduling, Valencia, Spain, 65-68
 | 
| J. Rieck, J. Zimmermann (2015)Exact Methods for Resource Leveling Problems
 In: C. Schwindt, J. Zimmermann (eds.) Handbook on Project Management and Scheduling Vol. 1. Springer, Cham (i.a.), Chapter 17
 | 
| J.-H. Bartels, J. Zimmermann (2015)Scheduling Tests in Automotive R&D Projects Using a Genetic Algorithm
 In: C. Schwindt, J. Zimmermann (eds.) Handbook on Project Management and Scheduling Vol. 2. Springer, Cham (i.a.), Chapter 52
 | 
| S. Kreter, J. Zimmermann (2014)Time index-based models for the RCPSP/max-cal
 In: Proceedings of the 14th International Conference on Project Management and Scheduling, Munich, Germany, 189-192
 | 
| C. Ehrenberg, J. Zimmermann (2012)Simulation-based optimization in make-to-order production: Scheduling for a special-purpose glass manufacturer
 In: Proceedings of the 2012 Winter Simulation Conference, edited by C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose and A. M. Uhrmacher
 | 
| M. Schulze, J. Zimmermann (2011)Scheduling in the Context of Underground Mining
 In: B. Hu, K. Morasch, S. Pickl, M. Siegel (eds.), Operations Research Proceedings 2010, Springer, Berlin, 611-616
 | 
| C. Ehrenberg, J. Zimmermann (2011)Simulation-based optimization in make-to-order production: Resource leveling for a special-purpose glass manufacturer
 In: W. Maurer: Tagungsband zum 21. Symposium Simulationstechnik der ASIM, Winterthur, Switzerland
 | 
| T. Gather, J. Rieck, J. Zimmermann (2010)A Linearized Mixed-Integer Formulation for the Resource Levelling Problem
 In: Proceedings of the 12th International Conference on Project Management and Scheduling, Tours, France, 199-202
 | 
| C. Hemig, J. Zimmermann (2009)Integrated Production and Staff Planning in the Automotive Industry
 In: CTIT Workshop Proceedings, 9th Workshop on Models and Algorithms for Planning and Scheduling Problems (MAPSP) 2009, Abbey
 | 
| J. Zimmermann, J.-H. Bartels (2008)A Project Scheduling Approach for Dismantling Nuclear Power Plants
 In: F. Serifoglu, Ü. Bilge (eds.), PMS 2008 Proceedings of the Eleventh International Workshop on Project Management and Scheduling, Istanbul 2008, 297-300
 | 
| J. Rieck, J. Zimmermann (2008)Koordinierung der Geschäftstätigkeiten von Speditionen in Netzwerken von Stückgutkooperationen
 In: K. Inderfurth, G. Neumann, M. Schenk, G. Wäscher, D. Ziems (eds.), Netzwerklogistik, Begleitband zur 13. Magdeburger Logistik-Tagung. Magdeburg, 123-135
 | 
| C. Hemig, J. Zimmermann (2008)Production Chain Planning in the Automotive Industry
 In: Operations Research Proceedings 2008, Königstein, 12-18
 | 
| C. Hemig, J. Zimmermann (2008)Production Planning in the Interior of the Automotive Industry's Production Chain
 In: Conference Proceedings ECCO XXI 2008, Dubrovnik, 65-66
 | 
| J. Zimmermann (2008)Mathematische Methoden zur Lösung von Logistikproblemen
 In: R. Köther, Taschenbuch der Logistik, Fachbuchverlag Leipzig, Chapter 19, 273-288, 3rd edition
 | 
| T. Gather, J. Zimmermann, J.-H. Bartels (2008)Tree-based Methods for Resource Investment and Resource Leveling Problems
 In: F. Serifoglu, Ü. Bilge (eds.), PMS 2008 Proceedings of the Eleventh International Workshop on Project Management and Scheduling, Istanbul 2008, 94-98
 | 
| J. Rieck, J. Zimmermann (2007)A Sampling Procedure for Real-Life Rich Vehicle Routing Problems
 In: K.-H. Waldmann, U. M. Stocker (eds.), Operations Research Proceedings 2006. Springer, Berlin, 355-360
 | 
| G. Askar, T. Sillekens, L. Suhl, J. Zimmermann (2007)Flexibility planning in automotive plants
 In: H.-O. Günther, D. C. Mattfeld, L. Suhl, (eds.), Management logistischer Netzwerke. Physica, Heidelberg, 235-255
 | 
| C. Hemig, J. Zimmermann (2007)Medium-Term Production and Staff Planning in the Automotive Industry
 In: Proceedings of the 3rd Multidisciplinary International Conference on Scheduling: Theory and Application, Paris, August 28-31, 209-216
 | 
| G. Askar, J. Zimmermann (2007)Optimal Usage of Flexibility Instruments in Automotive Plants
 In: K.-H. Waldmann, U. M. Stocker (eds.), Operations Research Proceedings 2006. Springer, Berlin, 479-484
 | 
| C. Hemig, J. Zimmermann (2006)Mid-Term Planning of Flexibility Tools in the Automobile Industry
 In: Jenaer Schriften zur Mathematik und Informatik, 17. Workshop on Discrete Optimization, Siegmundsburg, Germany, June 11-14, 16-19
 | 
| J.-H. Bartels, J. Zimmermann (2006)Minimizing the Total Discounted Cost of Dismantling a Nuclear Power Plant
 In: Digital proceedings of 17th International Conference on the Applications of Computer Sciences and Mathematics in Architecture and Civil Engineering, July 2006, ISSN 1611-4085, 9 S.
 | 
| C. Stark, J. Zimmermann (2006)Models and Methods for Workforce Scheduling: An Application to Casino Operations
 In: M. Morlock, C. Schwindt, N. Trautmann, J. Zimmermann (eds.), Perspectives on Operations Research: Essays in Honor of Klaus Neumann. Deutscher Universitäts-Verlag, Wiesbaden, 239-253
 | 
| K. Neumann, J. Zimmermann (2006)Optimal Renting of Resources in Production and Project Scheduling
 In: Quantitative Methoden der Logistik und des Supply Chain Management, Festschrift für Prof. Dr. Heinz Isermann, Verlag Dr. Kovac, 155-164
 | 
| J. Zimmermann (2006)Optimal Resource Allocation in Projects
 In: Jenaer Schriften zur Mathematik und Informatik, 17. Workshop on Discrete Optimization, Siegmundsburg, Germany, June 11-14, 32-35
 | 
| J. Zimmermann, J.-H. Bartels (2006)Optimizing the Use of Experimental Vehicles -- Problem Description and Mathematical Model
 In: Proceedings of the 10th International Workshop on Project Management and Scheduling, Poznan, April 26-28, 383-387
 | 
| J.-H. Bartels, J. Zimmermann (2006)Optimizing the Use of Experimental Vehicles -- Solution Procedures
 In: Proceedings of the 10th International Workshop on Project Management and Scheduling, Poznan, April 26-28, 68-72
 | 
| K. Neumann, C. Schwindt, J. Zimmermann (2006)Resource-constrained project scheduling with time windows: Recent developments and new applications.
 In: J. Jozefowska, J. Weglarz (eds.), Perspectives in Modern Project Scheduling, Springer, New York, 375-407
 | 
| J.-H. Bartels, J. Zimmermann (2006)Scheduling Tests in Automotive R&D Projects
 In: Operations Research Proceedings 2005, Springer, Berlin, 661-666
 | 
| J.-H. Bartels, J. Zimmermann (2006)Scheduling the Dismantling of Nuclear Power Plants
 In: C. Henggeler Antunes, Á. Gomes (eds.), Proceedings of the 19th Mini-EURO-Conference on Operational Research Models and Methods in the Energy Sector, Coimbra, 8 S.
 | 
| J. Rieck, J. Zimmermann (2006)Tourenplanung mittelständischer Speditionsunternehmen in Stückgutkooperationen
 In: H.-D. Haasis, H. Kopfer, J. Schönberger (eds.), Operations Research Proceedings 2005, Springer, Berlin, 2006, 411-416
 | 
| J. Zimmermann, J.-H. Bartels (2006)Tree-based Methods for Resource Investment and Resource Levelling Problems
 In: Digital proceedings of 17th International Conference on the Applications of Computer Sciences and Mathematics in Architecture and Civil Engineering, July 2006, ISSN 1611-4085, 6 S.
 |  | 
| C. Stark, J. Zimmermann (2005)An Exact Branch-and-Price Algorithm for Workforce Scheduling
 In: H. Fleuren, D. den Hertog, P. Kort (eds.), Operations Research Proceedings Volume 2004, 207-212, Springer
 | 
| J. Zimmermann (2004)Scheduling Regular and Temorary Employees in a Casino
 In: Proceedings of the 16. Workshop on Discrete Optimization, Weimar, 63-66
 | 
| J. Zimmermann (2003)Mathematische Methoden zur Lösung von Logistikproblemen
 In: R. Köther, Taschenbuch der Logistik, Fachbuchverlag Leipzig, Chapter 19, 273-288
 | 
| J. Zimmermann (2003)Modelle und Verfahren zur Planung von langfristigen Bauprojekten unter Kapitalwertgesichtspunkten
 In: Proceedings of the 16th International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering, ISSN: 1611-4085
 | 
| J. Zimmermann (2002)Parametric Optimization for the Evaluation of Investment Projects
 Proceedings of the Eighth International Workshop on Project Management and Scheduling, Valencia, 378-382
 | 
| J. Zimmermann (2000)Order-Based Algorithms for Resource Levelling of Projects
 Proceedings of the Seventh International Workshop on Project Management and Scheduling, Osnabrück, 319-321
 | 
| J. Zimmermann (2000)Project Scheduling with Discounted Cash Flows and General Temporal Constraints
 In: K. Inderfurth, G. Schwödiauer, W. Domschke, F. Juhnke, P. Kleinschmidt, G. Wäscher (1999): Operations Research Proceedings 1999, 419-424, Springer
 | 
| K. Neumann, J. Zimmermann (1999)Methods for Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions and Schedule-Dependent Time Windows
 In: J. Weglarz, Project Scheduling: Recent Models, Algorithms, and Applications, Kluwer Academic Publishers, 261-287
 | 
| C. Engel, A. Steinhoff, J. Zimmermann (1998)Objectives for Order-Sequencing in Automobile Production
 In: A. Drexl und A. Kimms, Beyond Manufacturing Resource Planning (MRP II) - Advanced Models and Methods for Production Planning, Springer, Berlin, 307-331
 | 
| K. Neumann, J. Zimmermann (1998)Resource-Constrained Project Scheduling with Nonregular Objective Functions: Schedule Construction and Schedule Improvement Procedures
 In: G. Barbarosoglu, S. Karabati, L. Özdamar, G. Ulusoy, Proceedings of the Sixth International Workshop on Project Management and Scheduling, Istanbul, 141-144
 | 
| K. Neumann, J. Zimmermann (1998)Resource-Constrained Project Scheduling with Nonregular Objective Functions: Structural Questions and Foundations of Heuristic Procedures
 in: Barbarosoglu G., Karabati S., Özdamar L. und Ulusoy G., Proceedings of the Sixth International Workshop on Project Management and Scheduling, Istanbul, 106-110
 |