Prof. Dr. Christoph Schwindt
Publikationen
Bücher
- C. Schwindt, J. Zimmermann (eds.)
Handbook on Project Management and Scheduling Vol. 1. International Handbooks on Information Systems.
Springer, Cham, 2015
► Download
- C. Schwindt, J. Zimmermann (eds.)
Handbook on Project Management and Scheduling Vol. 2. International Handbooks on Information Systems.
Springer, Cham, 2015
► Download
- M. Morlock, C. Schwindt, N. Trautmann, J. Zimmermann (eds.)
Perspectives on Operations Research: Essays in Honor of Klaus Neumann.
Deutscher Universitäts-Verlag, Wiesbaden, 2006
► Download
- C. Schwindt
Resource Allocation in Project Management.
Springer, Berlin, 2005
Rezensionen:
A. Zilinskas in Interfaces 37, 86-87, 2007
Ph. Baptiste in Operations Research Letters 35, 139-140, 2006
► Download
- K. Neumann, C. Schwindt, J. Zimmermann
Project Scheduling with Time Windows and Scarce Resources, 2. Auflage.
Springer, Berlin, 2003
Rezensionen:
H.K. Alfares in Int J Prod Res 42, 4427, 2004
J. Xue in J Oper Res Soc 56, 2005
J. Blazewicz in Zentralblatt MATH 1059, 2005
► Download
- C. Schwindt
Verfahren zur Lösung des ressourcenbeschränkten Projektdauerminimierungsproblems.
Shaker, Aachen, 1998
Referierte Fachzeitschriften
- B. Alhaji, J. Beecken, R. Ehlers, J. Gertheiss, F. Merz, J. P. Müller, M. Prilla, A. Rausch, A. Reinhardt, D. Reinhardt, C. Rembe, N.-O. Rohweder, C. Schwindt, S. Westphal, J. Zimmermann
Engineering human-machine teams for trusted collaboration. Big Data and Cognitive Computing 4(4), 35, 2020
► Download
- N. Trautmann, C. Schwindt
A cyclic approach to large-scale short-term planning in chemical batch production.
Journal of Scheduling 12, 595-606, 2009
► Download
- F. Ballestin, C. Schwindt, J. Zimmermann
Resource leveling in make-to-order production: Modeling and heuristic solution method.
International Journal of Operations Research 4, 50-62, 2007
► Download
- K. Neumann, C. Schwindt, N. Trautmann
Scheduling of continuous and discontinuous material flows with intermediate storage restrictions.
European Journal of Operational Research 165, 495-509, 2005
► Download
- C. Mellentien, C. Schwindt, N. Trautmann
Scheduling the factory pick-up of new cars.
OR Spectrum 26, 579-601, 2004
► Download
- R. Kolisch, K. Meyer, R. Mohr, C. Schwindt, M. Urmann
Ablaufplanung für die Leitstrukturoptimierung in der Pharmaforschung.
Zeitschrift für Betriebswirtschaft 73, 825-848, 2003
► PDF
- K. Neumann, C. Schwindt, J. Zimmermann
Order-based neigborhoods for project scheduling with nonregular objective functions.
European Journal of Operations Research 149, 325-343, 2003
► Download
- C. Schwindt, N. Trautmann
Scheduling the production of rolling ingots: Industrial context, model, and solution method.
International Transactions in Operational Research 10, 547-563, 2003
► Download
- K. Neumann, C. Schwindt, N. Trautmann
Advanced production scheduling for batch plants in process industries.
OR Spectrum 24, 251-279, 2002.
Ist ebenfalls erschienen in: Günther, H.-O., van Beek, P. (eds.), Advanced Planning and Scheduling Solutions in Process Industries. Springer, Berlin, 2003, pp. 43-72
► Download
- C. Schwindt, J. Zimmermann
Parametrische Optimierung als Instrument zur Bewertung von Investitionsprojekten.
Zeitschrift für Betriebswirtschaft 72, 593-617, 2002
► PDF
- K. Neumann, C. Schwindt
Project scheduling with inventory constraints.
Mathematical Methods of Operations Research 56, 513-533, 2002
► Download
- K. Neumann, C. Schwindt, J. Zimmermann
Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications.
Central European Journal of Operations Research 10, 113-148, 2002
► PDF
- C. Schwindt, J. Zimmermann
A steepest ascent approach to maximizing the net present value of projects.
Mathematical Methods of Operations Research 53, 435-450, 2001
► Download
- B. Franck, K. Neumann, C. Schwindt
Project scheduling with calendars.
OR Spektrum 23, 325-334, 2001
► Download
- B. Franck, K. Neumann, C. Schwindt
Truncated branch-and-bound, schedule construction, and schedule-improvement procedures for resource-constrained project scheduling.
OR Spektrum 23, 297-324, 2001
► Download
- K. Neumann, H. Nübel, C. Schwindt
Active and stable project scheduling.
Mathematical Methods of Operations Research 52, 441-465, 2000
► Download
- C. Schwindt, N. Trautmann
Batch scheduling in process industries: An application of resource-constrained project scheduling.
OR Spektrum 22, 501-524, 2000
► Download
- K. Neumann, C. Schwindt
A capacitated hierarchical approach to make-to-order production.
European Journal of Automation 32, 397-413, 1998
► PDF
- B. Franck, K. Neumann, C. Schwindt
A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods.
OR Spektrum 19, 77-85, 1997
► Download
- K. Neumann, C. Schwindt
Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production.
OR Spektrum 19, 205-218, 1997
► Download
Beiträge in Tagungs- und Sammelbänden
- M. Sillus, C. Schwindt
A time-based schedule-generation scheme for project scheduling with storage resources.
18th International Workshop on Project Management and Scheduling. Ghent, April 6-7, 2022
► Download
- F. Merz, C. Schwindt, S. Westphal, J. Zimmermann
An auction-based mechanism for the formation and scheduling of heterogeneous human-machine teams.
In: K. H. Chai, S. K. Moon, R. Jiao, M. Xie (eds.) Proceedings of the 2021 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 13-16, 2021, pp. 863-868
► Download
- N. Krippendorff, C. Schwindt
Control of shared production buffers: A reinforcement learning approach.
In: K. H. Chai, S. K. Moon, R. Jiao, M. Xie (eds.) Proceedings of the 2021 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 13-16, 2021, pp. 703-707 (nominated for Best Paper Award)
► Download
- F. Merz, C. Schwindt, S. Westphal, J. Zimmermann
A multi-round auction for staff to job assignment under myopic best response dynamics.
In: T. H. Ho, K. H. Chai, R. Jiao, M. Xie (eds.) Proceedings of the 2020 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 14-17, 2020, pp. 1137-1141 (nominated for Best Paper Award)
► Download
- N. Krippendorff, C. Schwindt
Allocation and management of shared production buffers: Problem formulation and classification scheme.
Extended Abstracts of the 12th Conference on Stochastic Models of Manufacturing and Service Operations SMMSO 2019, pp. 85-87
- C. Schwindt
Termin- und Kapazitätsplanung.
In: H. Corsten, R. Gössinger, T. S. Spengler (eds.), Handbuch Produktions- und Logistikmanagement in Wertschöpfungsnetzwerken. de Gruyter, Berlin und Boston, 2018, pp. 624-645
► Download
- A. Heßler, C. Schwindt
Markov models for system throughput analysis in warehouse design.
In: A. Fink, A. Fügenschuh, M. J. Geiger (eds.), Operations Research Proceedings 2016. Springer, Berlin, 2017, pp. 475-480
► Download
- A. Heßler, C. Schwindt
Throughput analysis of random storage systems operated under the closest eligible location rule.
In: A. De Meyer, K. H. Chai, R. Jiao, N. Chen, M. Xie (eds.) Proceedings of the 2017 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 10-13, 2017, Paper IEEM17-P-0411 (nominated for Best Paper Award)
► Download
- A. Heßler, C. Schwindt
Throughput analysis of random storage systems: Closest eligible location pays.
In: T. Bousonville, T. Melo, N. Rezg, F. Vernadat (eds.) Proceedings of the 7th International Conference on Industrial Engineering and Systems Management IESM 2017, Saarbrücken, October 11-13, 2017, pp. 44-49.
► PDF
- C. Schwindt, T. Paetz
A serial schedule-generation scheme for preemptive project scheduling problems with generalized precedence relations and regular min-max criteria.
In: Proceedings of the 15th International Conference on Project Management and Scheduling, Valencia, April 19-22, 2016, pp. 210-214
► PDF
- I. Weiss, C. Schwindt
The Resource Transfer Problem.
In: Proceedings of the 15th International Conference on Project Management and Scheduling, Valencia, April 19-22, 2016, pp. 42-46
► PDF
- I. Weiss, C. Schwindt
The Resource Transfer Problem: Modeling and solving integrated scheduling and routing problems.
Proceedings of the 2016 IEEE International Conference on Industrial Engineering and Engineering Management, Bali, 2016, December 5-7, 2016, Paper IEEM16-P-0272
► Download
- C. Schwindt, T. Paetz
Continuous Preemption Problems.
In: C. Schwindt, J. Zimmermann (eds.), Handbook on Project Management and Scheduling. International Handbooks on Information Systems, Springer, Berlin, 2015, Chapter 13, pp. 251-295
► Download
- C. Schwindt, J. Zimmermann
Project management and scheduling.
In: C. Schwindt, J. Zimmermann (eds.), Handbook on Project Management and Scheduling. International Handbooks on Information Systems, Springer, Berlin, 2015, pp. xxi-xlvii
► PDF
- T. Paetz, C. Schwindt
Column generation-based lower bounds for resource leveling problems.
In: T. Fliedner, R. Kolisch, A. Naber (eds.), Proceedings of the 14th International Conference on Project Management and Scheduling, Munich, March 30-April 2, 2014, pp. 173-176
► Download
- C. Schwindt, T. Haselmann
The preemptive project scheduling problem with generalized precedence relationships.
Proceedings of the 13th International Conference on Project Management and Scheduling, Leuven, April 1-4, 2012, pp. 278-281
- B. Scholz-Reiter, C. Schwindt, E. M. Frazzon, Th. Makuschewitz
An approach to negotiation-based alignment of manufacturing and transportation systems along global production networks.
In: N. A. Duffie (ed.), Proceedings of the 44th CIRP Conference on Manufacturing Systems, Madison, WI, May 31–June 3, 2011. Omnipress, Madison, WI
- B. Scholz-Reiter, C. Schwindt, Th. Makuschewitz, E. M. Frazzon
An approach for the integration of production scheduling and inter-facility transportation within global supply chains.
In: M. D. Hanna (ed.), Proceedings of the POMS 21st Annual Conference, Vancouver, May 7-10, 2010, Paper 015-0387
► Download
- C. Schwindt, S. Herrmann, H. Sagebiel
A closed-loop approach to continuous process scheduling.
In: Sun, H., Jiao, R., Xie, M. (eds.), Proceedings of the 2009 IEEE International Conference on Industrial Engineering and Engineering Management, Hong Kong, December 8-11, 2009, pp. 1951-1955 (honored with Conference Paper Award)
► Download
- N. Trautmann, R. Fink, H. Sagebiel, C. Schwindt
A decomposition approach to short-term scheduling of multi-purpose batch processes.
18th European Symposium on Computer Aided Process Engineering. Elsevier, Amsterdam, 2008, pp. 157-162
► Download
- S. Herrmann, C. Schwindt
A heuristic for the short-term planning of multi-purpose continuous plants.
18th European Symposium on Computer Aided Process Engineering. Elsevier, Amsterdam, 2008, Paper FP00309
► Download
- N. Trautmann, R. Fink, H. Sagebiel, C. Schwindt
A MIP/RCPSP decomposition approach to short-term planning in chemical batch production with non-identical parallel processing units.
In: Helander, M., Xie, M., Jiao, R., Tan, K.C. (eds.), Proceedings of the 2007 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 2-5, 2007, pp. 1342-1346 (nominated for Best Paper Award)
► Download
- C. Schwindt, R. Fink, N. Trautmann
A priority-rule based method for scheduling in chemical batch production.
In: Helander, M., Xie, M., Jiao, R., Tan K.C. (eds.), Proceedings of the 2007 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, December 2-5, 2007, pp. 1347-51
► Download
- N. Trautmann, C. Schwindt
Large-scale short-term planning in chemical batch production.
In: Baptiste, Ph., Kendall, G., Munier-Kordon, A., Sourd, F. (eds.), Proceedings of the 3rd Multidisciplinary International Conference on Scheduling: Theory and Applications, Paris, August 28-31, 2007, pp. 490-497
► Download
- S. Herrmann, C. Schwindt
Planning and scheduling continuous operations in the process industries.
In: Günther, H.-O., Mattfeld, D.C., Suhl, L., (eds.), Management logistischer Netzwerke. Physica, Heidelberg, 2007, pp. 279-299
► Download
- C. Schwindt, N. Trautmann
Rolling ingots production scheduling.
Artigues, C., Demassey, S., Néron, E. (eds.), Resource-Constrained Project Scheduling: Models, Extensions, and Applications. ISTE Publishing, London, 2007, Ch. 17, pp. 263-273
► Download
- C. Schwindt, N. Trautmann
A cyclic approach to large-scale short-term planning of multi-purpose batch plants.
In: Morlock, M., Schwindt, C., Trautmann, N., Zimmermann, J. (eds.), Perspectives on Operations Research: Essays in Honor of Klaus Neumann. Deutscher Universitäts-Verlag, Wiesbaden, 2006, pp. 225-238
► PDF
- C. Schwindt, S. Herrmann, N. Trautmann
A heuristic decomposition method for the short-term planning of continuous plants.
Proceedings of the Tenth International Workshop on Project Management and Scheduling, Posnan, April 26-28, 2006, pp. 313-318
► PDF
- Trautmann, N., Schwindt, C.
A heuristic method for large-scale batch scheduling in the process industries.
In: Haasis, H.-D., Kopfer, H., Schönberger, J. (eds.), Operations Research Proceedings 2005. Springer, Berlin, 2006, pp. 155-160
► Download
- C. Schwindt, S. Herrmann, N. Trautmann
Planning and scheduling of multipurpose continuous plants.
In: Marquardt, W., Pantelides, C. (eds.), 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering. Elsevier, Amsterdam, 2006, pp. 2159-2164
► Download
- N. Trautmann, C. Schwindt
Priority-rule based scheduling of chemical batch processes.
In: Marquardt, W., Pantelides, C. (eds.), 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering. Elsevier, Amsterdam, 2006, pp. 2165-2170
► Download
- K. Neumann, C. Schwindt, J. Zimmermann
Resource-constrained project scheduling with time windows: Recent developments and new applications.
In: Jozefowska, J., Weglarz, J. (eds.), Perspectives in Modern Project Scheduling. Kluwer, Boston, 2006, pp. 375-407
► Download
- N. Trautmann, C. Schwindt
A MINLP/RCPSP decomposition approach for the short-term planning of batch production.
In: Piugjaner, L., Espuna, A. (eds.), 15th European Symposium on Computer Aided Process Engineering. Elsevier, Amsterdam, 2005, pp. 1309-1314
► Download
- C. Schwindt, N. Trautmann
A priority-rule based method for batch production scheduling in the process industries.
In: Ahr, D., Fahrion, R., Oswarld, M., Reinelt, G. (eds.), Operations Research Proceedings 2003. Springer, Berlin, 2004, pp. 111-118
► Download
- K. Gentner, K. Neumann, C. Schwindt, N. Trautmann
Batch production scheduling in the process industries.
In: Leung, J.Y.T. (ed.), Handbook of Scheduling: Algorithms, Models and Performance Analysis. CRC Press, Boca Raton, 2004, pp. 48.1-48.21
- C. Schwindt
Project scheduling with changeover times: A branch-and-bound approach.
Proceedings of the International Conference on Industrial Engineering and Production Management, Porto, May 26-28, 2003, pp. 44-52
► PDF
- C. Schwindt, N. Trautmann
Scheduling of rolling ingots production.
In: Leopold-Wildburger, U., Rendl, F., Wäscher, G. (eds.), Operations Research Proceedings 2002. Springer, Berlin, 2003, pp. 83-88
► Download
- J. Zimmermann, C. Schwindt
Parametric optimization for the evaluation of investment projects.
In: Proceedings of the Eight International Workshop on Project Management and Scheduling, Valencia, April 3-5, 2002, pp. 378-382
► Download
- C. Schwindt, N. Trautmann
Scheduling continuous material flows.
In: Proceedings of the 18th International Conference on CAD/CAM, Robotics, and Factories of the Future, Porto, July 3-5, 2002, pp. 757-764
► PDF
- C. Schwindt
Scheduling of continuous production in process industries.
In: Proceedings of the Eigth International Workshop on Project Management and Scheduling, Valencia, April 3-5, 2002, pp. 314-317
► PDF
- C. Schwindt, N. Trautmann
Storage problems in batch scheduling.
In: Chamoni, P., Leisten, R., Martin, A., Minnemann, J., Stadtler, H. (eds.), Operations Research Proceedings 2001. Springer, Berlin, 2002, pp. 213-217
► Download
- N. Trautmann, C. Schwindt
Storage problems in process scheduling.
In: Proceedings of the 18th International Conference on CAD/CAM, Robotics and Factories of the Future, Porto, July 3-5, 2002, pp. 749-754
► PDF
- K. Neumann, C. Schwindt, N. Trautmann
Short-term planning of batch plants in process industries.
In: Kischka, P., Leopold-Wildburger, U., Möhring, R.H., Radermacher, F.J. (eds.), Models, Methods and Decision Support for Management. Physica, Heidelberg, 2001, pp. 211-226
► Download
- C. Schwindt
Solution procedures for production planning and detailed scheduling in process industries.
In: Proceedings of the International conference on Industrial Engineering and Production Management, Québec City, August 20-23, 2001, pp. 271-280
► PDF
- C. Schwindt
Local search for the project scheduling with convex objective functions.
In: Proceedings of the Seventh International Workshop on Project Management and Scheduling, Osnabrück, April 17-19, 2000, pp. 239-241
► PDF
- C. Schwindt
Minimizing earliness-tardiness costs of resource-constrained projects.
In: Inderfurth, K., Schwödiauer, G., Domschke, W., Juhnke, F., Kleinschmiddt, P., Wäscher, G. (eds.), Operations Research Proceedings 1999. Springer, Berlin, 2000, pp. 402-407
► Download
- C. Schwindt
A branch-and-bound algorithm for the project duration problem subject to temporal and cumulative resource constraints.
In: Proceedings of the International conference on Industrial Engineering and Production Management, Glasgow, July 12-15, 1999, pp. 515-522
► PDF
- R. Kolisch, C. Schwindt, A. Sprecher
Benchmark instances for project scheduling problems.
In: Weglarz, J. (ed.), Project Scheduling: Recent Models, Algorithms and Applications. Kluwer, Boston, 1999, pp. 197-212
► Download
- C. Schwindt
Integrated multi-level capacitated lot sizing and temporal plus capacity planning.
In: Proceedings of the International Conference on Industrial Engineering and Production Management, Lyon, October 20-24, 1997, pp. 102-109
- C. Schwindt
A new branch-and-bound-based heuristic for resource-constrained project scheduling with minimal and maximal time lags.
In: Proceedings of the Fifth International Workshop on Project Management and Scheduling, Posnan, April 11-13, 1996, pp. 212-215
► PDF
- C. Schwindt
An efficient heuristic for solving resource-constrained project scheduling problems arising from make-to-order production.
In: Proceedings of the Workshop on Production Planning and Control, Mons, September 9-11, 1996, pp. 4-7
Sonstige Veröffentlichungen
- C. Schwindt
Bericht zum Forschungssemester 2018
► PDF
- C. Schwindt, N. Trautmann, R. Fink
Hierarchische Anlagenbelegungsplanung bei Chargenproduktion.
PPS-Management 2/2008, 35-38, 2008
- N. Trautmann, C. Schwindt
Methods of Plant Occupancy Planning in the Process Industry.
United States Patent, Pub. No. US 7062448 B2, 2006
- C. Schwindt, R. Fink, S. Herrmann, H. Sagebiel
Modelle und Methoden für die Anlagenbelegungsplanung in der Prozessindustrie.
TUContact 17, 62-67, 2005
- C. Schwindt, N. Trautmann
Operations Research im Supply-Chain-Management.
Karlsruher Transfer 28, 29-31, 2002
Arbeitspapiere
- R. Fink, C. Schwindt
A priority-rule based method for predictive-reactive batch production scheduling in the process industries
Technical Report PLC-3, Institut für Wirtschaftswissenschaft, TU Clausthal
► PDF
- C. Schwindt
Generation of resource-constrained project scheduling problems subject to temporal constraints.
Technical Report WIOR-443, Institut für Wirtschaftstheorie und Operations Research, Universität Karlsruhe (TH)
► PDF
- R. Heilmann, C. Schwindt
Lower bounds for RCPSP/max.
Techical Report WIOR-511, Institut für Wirtschaftstheorie und Operations Research, Universität Karlsruhe (TH)
► PDF
Vorträge
- Control of shared production buffers: A reinforcement learning approach. PDF
2021 IEEE International Conference on Industrial Engineering and Engineering Management, Dezember 2021 - A serial schedule-generation scheme for preemptive project scheduling problems with generalized precedence relations and regular min-max criteria. PDF
15th International Conference on Project Management and Scheduling, Valencia, April 2016 - A column-generation approach to lower bounds for resource leveling problems. PDF
20th Conference of the International Federation of Operational Research Societies (IFORS), Barcelona, Juli 2014 - Project scheduling under generalized precedence relations: A survey of structural issues, solution approaches, and applications. PDF
Plenary talk at the 14th International Conference on Project Management and Scheduling, Munich, April 2014 - Column-generation based lower bounds for project scheduling problems.
26th European Conference on Operational Research, Rome, Juli 2013 - The preemptive resource-constrained project scheduling problem with generalized precedence relationships. PDF
Workshop New Challenges in Scheduling Theory, Fréjus, Oktober 2012 - Models and bounds for preemptive project scheduling with generalized precedence relationships.
Operations Research 2012, Hannover, September 2012 - Lower and upper bounds for preemptive project scheduling with generalized precedence relationships.
25th European Conference on Operational Research, Vilnius, Juli 2012 - Temporal scheduling of projects with time-overlap trade-offs. PDF
Workshop on New Perspectives in Scheduling Theory, Hangzhou (China), Oktober 2011 - Modelle, Methoden und Anwendungen der ressourcenbeschränkten Projektplanung.
Gastvortrag am Departement Betriebswirtschaftslehre, Universität Bern, Oktober 2010 - Temporal scheduling of concurrent engineering projects.
24th European Conference on Operational Research, Lisbon, Juli 2010 - A closed-loop approach to continuous process scheduling. PDF
International Conference on Industrial Engineering and Engineering Management IEEM 2009, Hong Kong, Dezember 2009 - A closed-loop approach to continuous process scheduling problems.
23rd European Conference on Operational Research, Bonn, Juli 2009 - A closed-loop heuristic for continuous process scheduling.
Joint meeting of GOR working groups Mathematical Programming and Supply Chain Management, Bad Honnef, November 2008 - Exact and heuristic methods for continuous process scheduling.
Operations Research 2008, Augsburg, September 2008 - A heuristic for the short-term planning of multiproduct continuous plants.
18th European Symposium on Computer Aided Process Engineering, Lyon, Juni 2008 - An integrated approach to continuous process planning and scheduling.
Workshop New Challenges in Scheduling Theory, Centre International de Rencontres Mathématiques, Marseille, Mai 2008 - A priority-rule based method for scheduling in chemical batch production. PDF
2007 IEEM International Conference on Industrial Engineering and Engineering Management, Singapore, Dezember 2007 - A branch-and-bound algorithm for the preemptive resource-constrained project scheduling problem.
Operations Research 2007, Saarbrücken, September 2007 - Large-scale short-term planning in chemical batch production. PDF
Multidisciplinary International Scheduling Conference: Theory and Applications MISTA 2007, Paris, August 2007 - Enumeration schemes for scheduling problems with storage resources.
22nd European Conference on Operational Research, Prague, Juli 2007 - A comparison of relaxation-based enumeration schemes in production scheduling. PDF
Operations Research 2006, Karlsruhe, September 2006 - Planning and scheduling of multipurpose continuous plants.
16th European Symposium on Computer Aided Process Engineering, Garmisch-Partenkirchen, Juli 2006 - A cyclic approach to large-scale short-term planning of multipurpose batch plants.
21st European Conference on Operational Research, Reykjavik, Juli 2006 - A heuristic decomposition method for the short-term planning of continuous plants.
10th Workshop of the EURO Working Group on Project Management and Scheduling, Poznan, April 2006 - Robuste Projektplanung unter Ressourcenbeschränkungen.
Sitzung der Arbeitsgruppe Projektmanagement und Scheduling der Gesellschaft für Operations Research, Bonn, November 2005 - Robust project scheduling: An order-based approach. PDF
Operations Research 2005, Bremen, September 2005 - A MINLP/RCPSP decomposition approach for the short-term planning of batch production.
15th European Symposium on Computer Aided Process Engineering, Barcelona, Mai 2005 - Scheduling event-marketing activities in automotive industry: Solution procedure.
Operations Research 2004, Tilburg, September 2004 - Scheduling with storage resources. PDF
Symposium on Operations Research 2003, Heidelberg, September 2003 - Project scheduling with storage constraints: Truncated branch-and-bound algorithms.
19th European Conference on Operational Research, Istanbul, Juli 2003 - Project scheduling with changeover times: A branch-and-bound approach.
International Conference on Industrial Engineering and Production Management, Porto, Mai 2003 - Methoden zur Anlagenbelegungsplanung.
Workshop über Produktionsplanung in der Prozessindustrie, Berlin, April 2003 - Projektplanung unter Unsicherheit.
20. Südwest-Workshop über OR in Produktion und Logistik, Stuttgart, Januar 2003 - Scheduling und Ressourcenallokation: Detailed Scheduling mit Relax and Resolve.
SAP AG, Walldorf, Oktober 2002 - A branch-and-bound algorithm for the capital-rationed net present value problem. PDF
Symposium on Operations Research 2002, Klagenfurt, September 2002 - Scheduling continuous material flows.
18th International Conference on CAD/CAM Robotics, and Factories of the Future, Porto, Juli 2002 - Relaxed scheduling with SAP APO: Solution method.
16th Triennial Conference of the International Federation of Operational Research Societies, Edinburgh, Juli 2002 - Project scheduling with sequence-dependent changeover times: A branch-and-bound approach. PDF
XV Conference of the European Chapter on Combinatorial Optimization, Lugano, Mai 2002 - Scheduling of continuous production in process industries.
8th Workshop of the EURO Working Group on Project Management and Scheduling, Valencia, April 2002 - Verfahren zur Planung des ressourcenbeschränkten Projektminimierungsproblems mit planungsabhängigen Zeitfenstern.
Festcolloquium der Fakultät für Wirtschaftswissenschaften der Universität Karlsruhe anläßlich der Verleihung des Rudolf-Henn-Preises für Operations Research, Karlsruhe, Februar 2002 - Planung diskreter und kontinuierlicher Materialflüsse.
SAP AG, Walldorf, Oktober 2001 - Scheduling continuous material flows. PDF
Symposium on Operations Research 2001, Duisburg, September 2001 - Solution procedures for production planning and detailed scheduling in process industries.
International Conference on Industrial Engineering and Production Management, Québec City, August 2001 - Project scheduling with sequence-dependent changeover times.
18th European Conference on Operational Research, Rotterdam, Juli 2001 - Scheduling batch and continuous production in chemical industry.
Sitzung der Arbeitsgruppe Projektmanagement der Gesellschaft für Operations Research bei der BASF AG, Ludwigshafen, Mai 2001 - Projektplanung mit Transferzeiten.
10. DFG-Workshop über Projektplanung mit beschränkten Ressourcen, Berlin, April 2001 - Ein Dekompositionsverfahren zur Chargenplanung in der Prozeßindustrie.
Mathematisches Forum der BASF AG, Ludwigshafen, November 2000 - Bestandsmanagement im Detailed Scheduling.
Sitzung der Arbeitsgruppe Lagerhaltung der Gesellschaft für Operations Research bei der KPMG, Leipzig, Oktober 2000 - Scheduling and Resource Allocation: Bericht zum gemeinsamen Forschungsvorhaben 1997-2000.
SAP AG, Walldorf, September 2000 - A branch-and-bound algorithm for the capital-rationed net present value problem.
17th European Conference on Operational Research, Budapest, Juli 2000 - Local search for project scheduling with convex objective functions.
7th Workshop of the EURO Working Group on Project Management and Scheduling, Osnabrück, April 2000 - Reactive scheduling via earliness-tardiness cost minimization of resource-constrained projects.
SAP AG, Walldorf, Dezember 1999 - Lösung eines Batch-Scheduling-Problems der chemischen Industrie.
Bayer AG, Leverkusen, November 1999 - Minimizing earliness-tardiness costs of resource-constrained projects.
Symposium on Operations Research 1999, Magdeburg, September 1999 - A branch-and-bound algorithm for the project duration problem subject to temporal and cumulative resource constraints.
International Conference on Industrial Engineering and Production Managemen, Glasgow, Juli 1999 - Ablaufplanung unter Lagerbeschränkungen.
SAP AG, Walldorf, April 1999 - Anlagenbelegungsplanung in der Prozeßindustrie mit Modellen und Methoden der ressourcenbeschränkten Projektplanung.
6. DFG-Workshop über Projektplanung mit beschränkten Ressourcen, Lambrecht, März 1999 - Generation schemes for the optimization of various classes of objective functions in resource-constrained project scheduling.
16th European Conference on Operational Research, Brüssel, Juli 1998 - Projektplanung bei kumulativen Ressourcenbeschränkungen: Modelle, Methoden und Anwendungen.
10. Südwest-Workshop über OR in Produktion und Logistik, Mannheim, Januar 1998 - Integrated multi-level capacitated lot sizing and temporal plus capacity planning.
International Conference on Industrial Enginieering and Production Management, Lyon, Oktober 1997 - Verfahren zur Lösung des ressourcenbeschränkten Projektdauerminimierungsproblems mit planungsabhängigen Zeitfenstern.
3. DFG-Workshop über Projektplanung mit beschränkten Ressourcen, Kiel, Juli 1997 - Modellierung eines Process-Flow-Scheduling-Problems aus der Prozeßindustrie.
SAP AG, Walldorf, Juni 1997 - A problem generator for resource-constrained project scheduling problems with minimal and maximal time lags.
Workshop on Resource-Constrained Project Scheduling, Karlsruhe, April 1997 - Parametergesteuerte Generierung ressourcenbeschränkter Projektplanungsprobleme mit planungsabhängigen Zeitfenstern.
2. DFG-Workshop über Projektplanung mit beschränkten Ressourcen, Osnabrück, Februar 1997 - Exakte und heuristische Lösungsverfahren für das ressourcenbeschränkte Projektdauerminimierungsproblem mit minimalen und maximalen Zeitabständen.
Interfakultatives Oberseminar "Neue Methoden für schwer lösbare Optimierungsprobleme", Karlsruhe, Januar 1997 - Modelle und Methoden der ressourcenbeschränkten Projektplanung.
6. Südwest-Workshop über OR in Produktion und Logistik, Mannheim, September 1996 - Charakterisierung der Problemschwere von RCPSP/max-Instanzen.
Symposium on Operations Research 1996, Braunschweig, September 1996 - An efficient heuristic for solving resource-constrained project scheduling problems arising from make-to-order production.
Workshop on Production Planning and Control, Mons, September 1996 - A new branch-and-bound-based heuristic for resource-constrained project scheduling with minimal and maximal time lags.
5th Workshop of the EURO Working Group on Project Management and Scheduling, Posnan, April 1996 - ProGen/max: Ein Problemgenerator für ressourcenbeschränkte Projektplanungsprobleme mit zeitlichen Minimal- und Maximalabständen.
Symposium on Operations Research 1995, Passau, September 1995 - Modellierung der Kundenauftragsfertigung als Projekt mit minimalen und maximalen Zeitabständen.
5. Südwest-Workshop über OR in Produktion und Logistik, Karlsruhe, Juni 1995
Werdegang
| 1968 | geboren in Freiburg im Breisgau |
| Mai 1987 | Abitur am Max-Planck-Gymnasium in Lahr/Schwarzwald |
| Oktober 1987 bis Dezember 1988 | Wehrdienst bei der Technischen Schule der Luftwaffe in Erndtebrück und beim FmRgt 31 in Meßstetten |
| Oktober 1988 bis September 1993 | Studium des Wirtschaftsingenieurwesens an der Universität Karlsruhe, Diplomarbeit "Vergleichende Bewertung mehrerer Varianten der Heuristik von Lambrecht und Vanderveken, zur Lösung des integrierten Losgrößen- und Ablaufplanungsproblems", (Diplomnote: "mit Auszeichnung") |
| Oktober 1993 bis Dezember 1993 | Magisterstudiengang Operations Research an der RWTH Aachen |
| Januar 1994 bis September 1997 | Wissenschaftlicher Angestellter am Institut für Wirtschaftstheorie und Operations Research der Universität Karlsruhe |
| Juli 1995 bis Juni 2000 | Mitarbeit am von der Deutschen Forschungsgemeinschaft geförderten Forschungsvorhaben "Projektplanung mit planungsabhängigen Zeitfenstern" (Verbundprojekt der Technischen Universität Berlin und der Universitäten Bonn, Karlsruhe, Kiel und Osnabrück) |
| Juli 1997 | Promotion zum Dr. rer. pol. (Gesamturteil: "mit Auszeichnung"), Dissertation "Verfahren zur Lösung des ressourcenbeschränkten Projektdauerminimierungsproblems mit planungsabhängigen Zeitfenstern" |
| September 1997 bis Oktober 2001 | Mitarbeit am von der SAP AG, Walldorf geförderten Forschungs- und Entwicklungsprojekt "Scheduling und Resource Allocation" |
| Oktober 1997 bis September 2003 | Wissenschaftlicher Assistent am Institut für Wirtschaftstheorie und Operations Research der Universität Karlsruhe, Leiter der Programmbibliothek Operations Resesarch an der Fakultät für Wirtschaftswissenschaften der Universität Karlsruhe |
| Juni 2002 | Habilitation mit der Lehrbefugnis für Operations Research, Produktion und Logistik, Habilitationsschrift "Introduction to Resource Allocation Problems in Project Management" |
| März 2003 | Erster Listenplatz für die Besetzung der C4-Professur für Wirtschaftsinformatik und Operations Research an der Universität Halle-Wittenberg (Nachfolge Prof. Dr. Dr. h. c. Wolfgang Lassmann) |
| August 2003 | Ruf auf die W3-Professur für Betriebswirtschaftslehre, insbesondere Produktion und Logistik an der Technischen Universität Clausthal |
| Oktober 2003 bis März 2004 | Hochschuldozent am Institut für Wirtschaftstheorie und Operations Research der Universität Karlsruhe |
| Oktober 2003 bis März 2004 | Vertretung der C4-Professur für Wirtschaftsinformatik und Operations Research an der Universität Halle-Wittenberg |
| Oktober 2003 bis März 2004 | Lehrbeauftragter für Betriebswirtschaftslehre und Operations Management an den Universitäten Clausthal und Karlsruhe |
| seit April 2004 | Universitätsprofessor für Betriebswirtschaftslehre, insbesondere Produktion und Logistik an der Technischen Universität Clausthal |
| April 2005 bis März 2011 | Studiendekan Wirtschaftswissenschaften der Fakultät für Energie- und Wirtschaftswissenschaften |
| Oktober 2005 bis März 2011 | Vorsitzender des Prüfungsausschusses Wirtschaftswissenschaften der Fakultät für Energie- und Wirtschaftswissenschaften |
| Wintersemester 2010/11 | Gastdozent für mathematische Programmierung im Operations Management an der Universität Bern (Schweiz) |
| Weitere Funktionen | Studienfachberater für den Bachelorstudiengang Wirtschaftsingenieurwesen Beautragter des Senats für Qualitätsmanagement in der Lehre Mitglied des Prüfungsausschusses Wirtschaftswissenschaften Mitglied des Zugangsprüfungsausschusses Wirtschaftsingenieurwesen |
| Beiratstätigkeiten | Mitglied im Editorial Board des European Journal of Operational Research |
| Gutachtertätigkeit | Gutachter für die Zeitschriften Annals of Operations Research, Gutachter für die Deutsche Forschungsgemeinschaft |
| Auszeichnungen | Rudolf-Henn-Preis für Operations Research 2001 |
Forschungsinteressen
- Ressourcenbeschränkte Ablaufplanung
- Stochastische Leisungsanalyse von Materialflusssystemen
- Vorbeugende und zustandsorientierte Instandhaltungsstrategien
- Produktionsplanung in der Prozessindustrie
- Koordination und Planung in dezentralen Systemen
Sonstige Interessen
- Zeitgeschichte
- Gastronomische Küche
- Romanische Architektur
- Französische Bandes Dessinées
Prof. Dr. Christoph Schwindt
Abteilung für BWL, insbesondere Produktion und Logistik
Julius-Albert-Straße 2
38678 Clausthal-Zellerfeld
Raum: 115
Telefon: +49 (5323) 72 - 7610
Fax: +49 (5323) 72 - 7698
E-Mail: christoph.schwindt@tu-clausthal.de
Sprechzeiten: Di 10.30 - 11.30 Uhr
Sekretariat: Astrid Ludwig
Telefon +49 (5323) 72 - 7615
E-Mail: produktion@tu-clausthal.de
Terminvereinbarung Sprechstunde: